72'' x 36'' Large Beveled Silver Bathroom Vanity Mirror, Shatterproof Rectangle by QUEENFUN

72'' x 36'' Large Beveled Silver Bathroom Vanity Mirror, Shatterproof Rectangle

$507.49
Sale price  $507.49 Regular price 
Skip to product information
72'' x 36'' Large Beveled Silver Bathroom Vanity Mirror, Shatterproof Rectangle by QUEENFUN

72'' x 36'' Large Beveled Silver Bathroom Vanity Mirror, Shatterproof Rectangle

$507.49
Sale price  $507.49 Regular price 
Shipping calculated at checkout.

Product Overview

The QUEENFUN 72'' x 36'' Large Beveled Silver Bathroom Vanity Mirror is a Wall-Mounted Mirrors product by QUEENFUN. It features ✔【unique beveled design & easy maintenance】our designer has broken the.

Key Features

  • ✔【Unique Beveled Design & Easy Maintenance】Our designer has broken the tradition by adding beveled designs to the edges of both the frame and the mirror, giving it a sleek look. The gap set between the len and frame makes the mirror appear suspended, creating a 3D effect. The premium brushed metal frame ensures it won't rust. The brushed finish not only provides a smooth touch but also makes the mirror be easy to clean.
  • ✔【Premium Material, Long Lifespan】Made of 3rd gener. eco-friendly mirror, provides a clear and 100% faithful reflection of real image without distortion. The mirror top treatment preventing any black spots or detachment even with prolonged use. Adopts thick aluminium alloy frame with IP54 anodized rating, adds double-layer corner code structure to strengthen the frame hardness. The overall frame has high strength and will not deform, while also protecting the mirror from damage.
  • ✔【Easy Installation & Enhanced Durability】Queenfun’s wall mirror stands out from the competition with its upgraded hanging system, providing an ultra-fast installation experience. Through multiple verifications, this installation method has demonstrated the capability to bear over three times the weight of mirrors of the corresponding size, ensuring a safer wall-mounting for your mirror. (Refer to the video on the product page for advanced installation information).
  • ✔【A Great Art Decor】Queenfun decorative wall mirror not only reflects images but also visually enlarges your space. It provides convenience in your daily life: when you're in a hurry to go, you can check your outfit in the hallway/entrance; You can use it for makeup removal at the dresser at night. This mirror with its elegant look and powerful functionality will be the perfect decorative addition to various spaces of home.
  • ✔【Upgraded Packaging & Worry-Free After-Sales Service】As a professional brand seller, we have upgraded to a thicker outer packaging box with multiple layers of protection after numerous tests and improvements. Coupled with anti-explosion surface treatment, even if the mirror is damaged during transportation, it won't shatter into pieces. If you encounter any shipping damages or missing parts, please contact our after-sales team via email, and we will provide you with a satisfied solution.

Why Choose the QUEENFUN 72'' x 36'' Large Beveled Silver Bathroom Vanity Mirror

The QUEENFUN 72'' x 36'' Large Beveled Silver Bathroom Vanity Mirror offers ✔【unique beveled design & easy maintenance】our designer has and ✔【premium material, long lifespan】made of 3rd gener. eco-friendly. These features make the QUEENFUN 72'' x 36'' Large Beveled Silver Bathroom Vanity Mirror a strong option in the Wall-Mounted Mirrors category.

Best For

The QUEENFUN 72'' x 36'' Large Beveled Silver Bathroom Vanity Mirror is best suited for everyday wall-mounted mirrors needs.

Quick Summary

The QUEENFUN 72'' x 36'' Large Beveled Silver Bathroom Vanity Mirror is a Wall-Mounted Mirrors product by QUEENFUN. Brand: QueenFun. Room Type: Bathroom, Bedroom, Dining Room, Hallway, Living Room. Shape: Rectangular. Product Dimensions: 36"L x 72"W. Frame Material: Aluminum. Price: $507.49.

Product Specifications

Specification Details
Brand QueenFun
Room Type Bathroom, Bedroom, Dining Room, Hallway, Living Room
Shape Rectangular
Product Dimensions 36"L x 72"W
Frame Material Aluminum

CARE & MAINTENANCE

To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.

SHIPPING & RETURNS

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible. Need to return something? Just let us know.

You may also like